Saturday, October 27, 2012

Progress; 3 Weeks and Counting!

It has been lots of fun coming home from work everyday to see the progress that's being made. Though the pace has been slower than expected, (or maybe we expected this?) things are coming along. The framing and plumbing are complete, all five new windows are in, we have a new boiler, and the chimney has been re-lined and re-pointed. One of the most tedious jobs this week was raising all the electrical and plumbing to go through the joists so as to create more head room. This was a big job that  we (and our tall friends) will be glad was done.

From the back of the basement, looking through where the double doors will be to the foot of the stairs.

Looking from the back wall (in the future bedroom) toward the front wall.


We had to close in the gas meter (to the left) so that will be where we mount the TV. Another new window too!

Looking into the bathroom, with laundry on the right and shower and toilet on the left. 
The vanity will be straight ahead.

Shower to the left, toilet to the right, facing the back wall of the house.


One of the new windows!
Bathroom windows from the outside.

  Window at the foot of the stairs.

Next week: electrical, insulation, and dry wall. Tiles will be next after that.